CITY OF LAKESIDE PARK, KENTUCKY

PUBLIC WORKS COMMITTEE

MEETING MINUTES – JUNE 5, 2025

 Attendance:  Mr. Bemheimer, Ms. Thaman, Mr. Landwehr, Mayor Markgraf, Public Works Director Mr. Greer, City Engineer Mr. Hellman, Andrew Walsh, Verdantes.

Audience:  No one present

The meeting was called to order and minutes of the May 1, 2025 meeting were approved.

City Engineer Martin Hellmann updated the committee concerning the sidewalk assessment project. Precision Concrete Cutting has completed its grinding work and submitted an invoice for the contract amount. Mr. Greer is verifying the cuts made and will compare with the invoice and consult with the city engineers. TMS Construction has begun slab replacement with completion expected within two (2) weeks. Residents will be invoiced upon verification of all completed work.

No significant updates were available for the Crestview Hills sidewalk project; planning may begin later this summer with construction next spring.

No significant updates were available for the Bellemonte resurfacing & curb project. The city will reapply for a grant for the current grant year.

No updates were discussed for the Dixie Highway bench project or crosswalk improvements.

Humphrey Concrete was set to begin the 2025-26 Street Program on Shaker & Marlo Way. Residents have been notified. Humphrey has acknowledged that all billing will occur in the 2025-26 budget year.

The repair of the. Williams Avenue drain trench was completed by TMS Construction through a change order to the sidewalk contract in the amount of $8,950.00.

The committee discussed the drainage issues at the corner of Turkeyfoot and Van Deren caused by the state’s excavation of the drainage ditches along Turkeyfoot. A meeting may be required with officials from the State Transportation Cabinet.

Mr. Greer updated the committee that Precise completed the mulching and weeding of the flower beds at the city park and city building. He also installed the flags on the poles along Dixie Highway. The speed radar sign will be relocated to West Lakeside Avenue near the Penwood Road intersection. After he finishes measuring the grinding and slab replacement work, he will paint curbs that require such work.

The next meeting was determined to be held on Tuesday, July 1, 2025 at 5:00 pm.

Meeting adjourned.